STAGE 1 : SUB-BASE AND DRAINAGE a) The ground base should be inspected first for its suitability and will be shaped as fishback and well compacted. b) Drainage canals will be excavated at certain distances in shape of fishbone, and main canals will be excavated alongside of the field with a specific slope. c) Geotextile felt will be laid in the canals and after fitting the drainage pipes on sand pillows the felt will be folded on the pipes. d) The canals will be filled with gravel e) To collect the field water one main and four small hollows will be digged. f) To water the field, water tank and springs will be established. g) The gravel will be smoothly levelled with a proper slope. h) The levelled gravel surface will be covered with asphalt or concrete layer. i) Shock pad will be applied on the asphalt/ concrete layer.
STAGE 2 : ARTIFICIAL TURF
a) The turf carpets will be spread out on the shockpad. b) The carpets wil be joined on a seaming tape with the help of a special adhesive c) The adhesive is a double component polyurathane glue. d) The white or yellow lines will be fixed as per approved dimensions. Optionally the surface outside playing area may be red color. e) The grass carpet will be filled with silica sand by special machinary. f) The granule will be filled on sand by special machinary.