OUTDOOR MINI FIELD TECHNICAL SPECIFICATIONS
STAGE 1. SUB-BASE :
a) Excavation: The field will be excavated and levelled. The canals will be excavated arround the field to build a concrete boundary. b) The boundary will contain 8-12 iron bars. c) To evacuate the water to outside the field, drainage pipes will be fixed in the boundary at 30 cm deep and at certain distances with enough slope from inside to outside. d) 3” anchorage pipes will be fixed upright in the boundary. e) BS 20 Ready concrete will be poured in the moulds. f) The entire surface will be filled with gravel.
STAGE 2. FENCING :
a) Iron columns will be welded vertically to anchorages fixed in the boundary. The horizontal top, mid and bottom iron pipes will be welded to the these columns. b) Reinforcement pipes will be welded diagonally to the horizontal pipes at each corner. The columns also will be reinforced by additional columns. c) To reinforce the sides, crosswise pipes will be welded to the side colomns and the columns on the back of goal posts. d) The lighting columns will be established with stairs on the lengthwise side of the pitch. e) A hinged door will be constructed for the field f) A pair of goal post will be constructed. g) All the iron material will be painted with undercoat and oil paint. h) The field sides will be fenced with galvanised, PVC coated 5x5 cm pores and 3,5 mm thick wire-fence. i) The fence will be reinforced with kink attached to the tie clips on the columns. j) The field uppersides will be covered by polyamid net with 12x12 cm pores. k) The ceiling will be covered by polyamid net with 15x15 cm pores. l) The goal posts will ve weared by polyamid net with 12x12 cm pores, 4 mm thickness. m) 400 W Lighting projectors will be fixed on the Lighting columns. n) The electricity cables will be extended upto board and will be delivered in working condition.
STAGE 3. : ARTIFICIAL TURF
a) The gravel surface will be entirely covered by felt. b) The turf carpets will be spread out on the felt. c) The carpets wil be joined on a seaming tape with the help of a special adhesive d) The adhesive is a double component polyurathane glue. e) The white or yellow lines will be fixed as per approved dimensions. Optionally the surface outside playing area may be red color. f) The grass carpet will be filled with silica sand by special machinary. g) The granule will be filled on sand by special machinary.