MULTI - PURPOSE ARTIFICIAL GRASS TECHNICAL SPECIFICATIONS
1.BÖLÜM ALTYAPI İŞLERİ
STAGE 1 SUB-BASE :
a) Excavation: The field will be excavated and levelled. The canals will be excavated arround the field to build a concrete boundary. b) The boundary will contain 8-12 iron bars. c) 3” anchorage iron pipes will be fixed on the surface of the boundary. d) BS 20 Ready concrete will be poured in the moulds. e) The entire surface will be filled with gravel. f) The gravel surface will be covered by a concrete.
STAGE 2 FENCING :
a) Iron columns will be welded vertically to anchorages fixed in the boundary. The horizontal top, mid and bottom iron pipes will be welded to the these columns. b) Reinforcement pipes will be welded diagonally to the horizontal pipes at each corner. The columns also will be reinforced by additional columns. c) To reinforce the sides, crosswise pipes will be welded to the side colomns and the columns on the back of goal posts. d) The lighting columns will be established with stairs on the lengthwise side of the pitch. e) A hinged door will be constructed for the field f) A set of volleyball net and net holders together with a set of basketball baskets will be installed. g) All the iron material will be painted with undercoat and oil paint. h) The field sides will be fenced with galvanised, PVC coated 4x4 cm pores wire-fence. i) The fence will be reinforced with kink attached to the tie clips on the columns. j) 400 W Lighting projectors will be fixed on the Lighting columns. k) The electricity cables will be extended upto board and will be delivered in working condition.
STAGE 3 ARTIFICIAL TURF :
a) The turf carpets will be spread out on the concrete surface. b) The carpets will be joined on a seaming tape with the help of a special adhesive c) The adhesive is a double component polyurathane glue. d) The white or yellow lines will be fixed as per approved dimensions for both basketball and volleyball games. e) The grass carpet will be filled with silica sand by special machinary.